Queensway Development – Project Portfolio

Westmasters has been a long-term contractor for the Queensway Estate, working alongside the landlord and property developers for over a decade. Throughout this period, we have delivered a wide range of commercial and structural projects across Queensway, including major refurbishments, landlord works and shell-and-core preparations for incoming tenants.

Our work has included full strip-outs back to the solid structure, steel framing, roof and floor replacements, extensions, rainwater and drainage upgrades, and all structural alterations required for new commercial occupiers.

Key projects completed in recent years include:

  • Queens Skate & Bowl (2016–2017),
  • 43 Queensway (2017), VIP bowling lanes (2018),
  • 36–38 Queensway (2019–2020), 8–12 Queensway (2022),
  • 40–44 Queensway (2023)
  • along with numerous smaller units and retail spaces.

QUEENS SKATE DINE BOWL VIP LANES

At Queen’s Skate Dine Bowl, we delivered the full construction of the new VIP bowling lanes, starting with a complete strip-out and demolition of the existing areas. Our team installed new structural elements including steel beams, supports and floor build-ups, followed by precise levelling and formation of the new lane bases. The works provided a clean, structurally sound shell ready for specialist bowling equipment installation and final fit-out.

QUEENS SKATE DINE BOWL VIP LANES

At Queen’s Skate Dine Bowl, we delivered the full construction of the new VIP bowling lanes, starting with a complete strip-out and demolition of the existing areas. Our team installed new structural elements including steel beams, supports and floor build-ups, followed by precise levelling and formation of the new lane bases. The works provided a clean, structurally sound shell ready for specialist bowling equipment installation and final fit-out.