Capital Tower – Roof & Structural Works

Westmasters delivered roof and structural works at Capital Tower in London, including structural alterations, steel installation and coordinated logistics for a commercial building in a constrained urban environment.

We delivered a new rooftop terrace at Capital Tower (15th floor), creating approximately 250 sqm of usable roof space. The project involved building a timber-joist base directly on the existing steel roof structure, laying timber decking across the surface and adding a secure perimeter fence to ensure safety at height.

On the rooftop we installed a timber-and-decking base, with a 1.5 m high glass-and-board perimeter barrier to allow panoramic city views while maintaining security. We also constructed a seating zone and a compact rooftop bar – ideal for small events, performances or social gatherings.

Because all materials had to be carried by hand up stairs (large items couldn’t fit the lift), the works required precise logistics and careful handling. Due to rooftop wind load, all fixings were installed strictly to design and specification to ensure long-term structural safety and durability.

Our works included:

This project forms part of Westmasters’ roof works and structural construction services delivered across Central London.

This page showcases progress photos of the structural works.